Steve,
Wow they are moving fast on your pool. It is looking great. You obviously got a good builder, well from what we can tell so far... we'll see how it works when it's all done.![]()
Eric
Steve,
Wow they are moving fast on your pool. It is looking great. You obviously got a good builder, well from what we can tell so far... we'll see how it works when it's all done.![]()
Eric
That seems to be what happens. Our back-fence neighbors had a (I guess) gunite pool done. Once the concrete was in, it sat for weeks, but when they did the surface layer, they had the water in it almost immediately--I gather some surfaces cure better if they are kept wet so they don't dry out too fast.
Carl
Steve,
Push your builder hard to get it done. Mine was complete within 29 days after the dig and I had a week between the dig and gunite. Water features will obviously take a little extra time but Spring is fast approaching down here and you know they tend to be wet. It looks great. Keep the pics coming.
Day 8 - 2/27
They started the plumbing today. It was insane to see how much trench they dug. They still have some more stuff to finish up tomorrow. I will post pictures soon. It is coming along!
Getting all the pipe ready
What a mess!
Steve
Last edited by skamp; 02-28-2007 at 08:03 PM.
Days 11 & 14 - 3/2 & 3/5
On Friday they finished the rock work and started the patio cover (different company). Overall the rock work far exceeded my expectations. It looks awesome. There are two small problems with the rock work. First they installed a few rocks on top of the spa even though we did not want them. They said they will fix it and replace it with flagstone. Second, the chip work on some of the flagstone edge does not look very nice. It looks like teeth instead of the normal random chipped look. They said they will fix that as well. They got a late start on the patio cover due to the support beams not showing up until 12:30. They started at 7:30 and put on the 6x6 posts and basically sat around until the beams showed up.
On Monday they did all the electrical. They ran 100 AMP's to my control panel and I have 2 1" breaker slots and 3 relays left for low voltage lighting. The almost completed the patio cover as well.
I was told they may start working on the decking today. If that is the case we really only have decking and the Pebble Tec left. That is insane! I will post pictures later today.
House before patio cover
Framing the cover
Getting close
Rock work done (right side)
Rock work done (left side)
Steve
Last edited by skamp; 03-14-2007 at 10:07 AM.
What a sweet turn time your on!!!
I'm curious, what color PebbleTec are you going with?
See ya,
Kelly
I have good confidence in the builder. They have been around since 1981, have no bad marks from the BBB and everything one I spoke with that got a pool from them has had good things to say. They did move fast to start but that is about the PB getting the subs lined up. It will be slower the next few weeks.
Steve