+ Reply to Thread
Results 1 to 10 of 58

Thread: Steve's pool build status - Work started 2/19/2007!

Hybrid View

  1. #1
    ehorn is offline Registered+ Thread Analyst ehorn 0
    Join Date
    Dec 2004
    Location
    Tucson, AZ, USA.
    Posts
    60

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Steve,

    Wow they are moving fast on your pool. It is looking great. You obviously got a good builder, well from what we can tell so far... we'll see how it works when it's all done.

    Eric

  2. #2
    CarlD's Avatar
    CarlD is offline SuperMod Emeritus Vortex Adjuster CarlD 4 stars CarlD 4 stars CarlD 4 stars CarlD 4 stars CarlD 4 stars CarlD 4 stars
    Join Date
    Dec 1969
    Location
    North Central NJ
    Posts
    6,607

    Default Re: Steve's pool build status - Work started 2/19/2007!

    That seems to be what happens. Our back-fence neighbors had a (I guess) gunite pool done. Once the concrete was in, it sat for weeks, but when they did the surface layer, they had the water in it almost immediately--I gather some surfaces cure better if they are kept wet so they don't dry out too fast.
    Carl

  3. #3
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by CarlD View Post
    That seems to be what happens. Our back-fence neighbors had a (I guess) gunite pool done. Once the concrete was in, it sat for weeks, but when they did the surface layer, they had the water in it almost immediately--I gather some surfaces cure better if they are kept wet so they don't dry out too fast.
    I think they told me they let the gunite cure for 7-10 days. They told me 5-8 weeks for completion so we still have a lot left to go. Thanks!

    Steve

  4. #4
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Steve,

    Push your builder hard to get it done. Mine was complete within 29 days after the dig and I had a week between the dig and gunite. Water features will obviously take a little extra time but Spring is fast approaching down here and you know they tend to be wet. It looks great. Keep the pics coming.

  5. #5
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by divnkd101 View Post
    Steve,

    Push your builder hard to get it done. Mine was complete within 29 days after the dig and I had a week between the dig and gunite. Water features will obviously take a little extra time but Spring is fast approaching down here and you know they tend to be wet. It looks great. Keep the pics coming.
    Yea I hear you on that. I had a lot of conversations with them and decided to build this time of year because they are less busy. I am sure they will push hard to get it done quick. Thanks!

    Steve

  6. #6
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Day 8 - 2/27

    They started the plumbing today. It was insane to see how much trench they dug. They still have some more stuff to finish up tomorrow. I will post pictures soon. It is coming along!

    Getting all the pipe ready




    What a mess!




    Steve
    Last edited by skamp; 02-28-2007 at 08:03 PM.

  7. #7
    Join Date
    Jul 2006
    Location
    Pearland, TX (Houston suburb)
    Posts
    89

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by skamp View Post
    Day 8 - 2/27

    They started the plumbing today. It was insane to see how much trench they dug. They still have some more stuff to finish up tomorrow. I will post pictures soon. It is coming along!

    Steve
    Don't know if you have any speaker wire, etc. you plan to run at the back of the pool. It's a good time to do it while the trenches are open. Plumbers should not have any issues with one more piece of conduit. Keep the pics coming.

  8. #8
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Days 11 & 14 - 3/2 & 3/5

    On Friday they finished the rock work and started the patio cover (different company). Overall the rock work far exceeded my expectations. It looks awesome. There are two small problems with the rock work. First they installed a few rocks on top of the spa even though we did not want them. They said they will fix it and replace it with flagstone. Second, the chip work on some of the flagstone edge does not look very nice. It looks like teeth instead of the normal random chipped look. They said they will fix that as well. They got a late start on the patio cover due to the support beams not showing up until 12:30. They started at 7:30 and put on the 6x6 posts and basically sat around until the beams showed up.

    On Monday they did all the electrical. They ran 100 AMP's to my control panel and I have 2 1" breaker slots and 3 relays left for low voltage lighting. The almost completed the patio cover as well.

    I was told they may start working on the decking today. If that is the case we really only have decking and the Pebble Tec left. That is insane! I will post pictures later today.

    House before patio cover



    Framing the cover



    Getting close



    Rock work done (right side)



    Rock work done (left side)




    Steve
    Last edited by skamp; 03-14-2007 at 10:07 AM.

  9. #9
    Join Date
    Dec 1969
    Location
    the woodlands, texas.
    Posts
    82

    Default Re: Steve's pool build status - Work started 2/19/2007!

    What a sweet turn time your on!!!

    I'm curious, what color PebbleTec are you going with?

    See ya,
    Kelly

  10. #10
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by ehorn View Post
    Steve,

    Wow they are moving fast on your pool. It is looking great. You obviously got a good builder, well from what we can tell so far... we'll see how it works when it's all done.

    Eric
    I have good confidence in the builder. They have been around since 1981, have no bad marks from the BBB and everything one I spoke with that got a pool from them has had good things to say. They did move fast to start but that is about the PB getting the subs lined up. It will be slower the next few weeks.

    Steve

+ Reply to Thread

Similar Threads

  1. Deer in Scuba Steve's pool
    By DJK555 in forum Pools, Pets and Creepy Critters
    Replies: 1
    Last Post: 09-28-2010, 06:19 PM
  2. Welcome year 2007 agp newbies
    By hrsdennis in forum Above-Ground Pool Construction & Repair
    Replies: 4
    Last Post: 03-21-2007, 07:03 PM
  3. Steve's pool project 1-24-07
    By skamp in forum In-Ground Pool Construction and Repair
    Replies: 49
    Last Post: 02-20-2007, 02:30 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts