Day 8 - 2/27
They started the plumbing today. It was insane to see how much trench they dug. They still have some more stuff to finish up tomorrow. I will post pictures soon. It is coming along!
Getting all the pipe ready
What a mess!
Steve
Last edited by skamp; 02-28-2007 at 08:03 PM.
Day 9 - 2/28
Today they completed the plumbing and set left it pressurized to test for leaks. There is a small hole in one of the pump housings under the inlet. I will have them replace the pump.
Lots of pipes and valves!
On the right are the valves for the water feature. They include.
1. Waterfall
2. Weeping wall
3. Bubblers in tanning ledge
4. Bypass back to return if I want to reduce the overall flow to the water features.
Stubout for the gas and water going to the outdoor kitchen.
Stubout for the firepit
Tomorrow they are doing the rock waterfall and accent rocks. Friday they are going to do the coping, waterline tile and spa. Monday the electric is going in. Also Friday my patio cover construction starts! I will post more pictures soon.
Steve
I already have one set of speakers that go on the back wall of my house that will be relocated under the covered patio. I am going to run a conduit to the backside of the pool to have an additonal set back there all ran to an A/B A+B switch. I will have to trench it my self but that is not that big of a deal. Thanks!
Steve
Looking good!
Day 10 - 3/1
All I can say is WOW! Today was great. They did almost all the rock work today and I am thrilled. The waterline flagstone, moss rock waterfall and accent boulders, jump rock, stacked moss rock in front of the spillway and moss rock flagstone around spa were completed. They only have to cement in the flagstone coping tomorrow.
Getting things ready
Getting the waterfall underway.
Starting on the stacked moss rock spillway
Waterfall is almost done
Moss rock flagstone around the raised spa.
Continued in next post
Day 10 continued
Installing the jump rock
Completed waterline flagstone
Waterfall and accent rocks are done!
Stacked moss rock spillway completed.
Tomorrow they start the covered patio and finish the rock work. The weather is starting to get nice and I am getting real excited!
Steve
Days 11 & 14 - 3/2 & 3/5
On Friday they finished the rock work and started the patio cover (different company). Overall the rock work far exceeded my expectations. It looks awesome. There are two small problems with the rock work. First they installed a few rocks on top of the spa even though we did not want them. They said they will fix it and replace it with flagstone. Second, the chip work on some of the flagstone edge does not look very nice. It looks like teeth instead of the normal random chipped look. They said they will fix that as well. They got a late start on the patio cover due to the support beams not showing up until 12:30. They started at 7:30 and put on the 6x6 posts and basically sat around until the beams showed up.
On Monday they did all the electrical. They ran 100 AMP's to my control panel and I have 2 1" breaker slots and 3 relays left for low voltage lighting. The almost completed the patio cover as well.
I was told they may start working on the decking today. If that is the case we really only have decking and the Pebble Tec left. That is insane! I will post pictures later today.
House before patio cover
Framing the cover
Getting close
Rock work done (right side)
Rock work done (left side)
Steve
Last edited by skamp; 03-14-2007 at 10:07 AM.
What a sweet turn time your on!!!
I'm curious, what color PebbleTec are you going with?
See ya,
Kelly