Re: PolyQuat and Shocking with Chlorine
Another 30 hours have past and the Free Chlorine is down to 2.8 ppm and just a hint of CC (FAS-DPD barely pink) I'll call it .2 but if I could have used a half drop
that probably would have done it. Also noticed pH is up a bit to 7.7 from 7.5 before the Quat.
I will begin injecting 6% Bleach when the pump come on (very early morning because of the frosty conditions). Anticipated (calculated) increase is 2.5 ppm based on injection rate and run time --- We'll see.
27038 Gallon InGround, Vinyl, DE filter.
Bookmarks