+ Reply to Thread
Results 1 to 3 of 3

Thread: HELP! New Gunite project has a "cold joint".

  1. #1
    Join Date
    Jul 2014
    Location
    TN
    Posts
    2

    Default HELP! New Gunite project has a "cold joint".

    Hello,

    I am having a 20x40 gunite installed. They "shot" it last week on the hottest day of the year. They started shooting the deep end walls at 7 am, around 2:30 they ran short of shotcrete mix and called for a final 4 yards, it took a couple of hours for the final concrete truck to come, and I noticed that as they trialed the bottom of the deep end, the guys boots were only sinking 3", this was at 5:30 pm, basically in the deep end area where the end of the job meets where they started. PB said dont worry, but I ended up with my boots on in the hole. I stuck the area of concern with a stick, 3-4" wet.

    My PB got in with a shovel and started digging down, we hit hard concrete. I can measure at the hole for the hydrostatic valve and tell I have about 11" of in the bottom. Earlier in the the "pour", we had a deep end wall slide out and lay a lot of concrete in the bottom, that helped facilitate the problem, because the concrete that ended up in the bottom earlier in the day, is what set up. I know I have a cold joint at about 3.5" down, on top of another 7-8" of bonded concrete, in the very bottom of the deep end. Whether it all bonded I dont know. Very concerned about moving forward without being sure this wont be a problem in the future.

    What should I do? Thanks in advance!

  2. #2
    PoolDoc's Avatar
    PoolDoc is offline Administrator Quark Inspector PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars PoolDoc 5 stars
    Join Date
    Jan 2005
    Location
    Georgia
    Posts
    11,386

    Default Re: HELP! New Gunite project has a "cold joint".

    You'd be better off posting on poolspaforum.com. There are a lot of pool guys there.

    However, some caution -- the concrete pool guys I know aren't literate enough to enjoy participating in a forum. It's a pretty rough job. That may not hold true everywhere, but I think it's pretty common. So odds are you'll end up talking to someone who may know guys who shoot gunite, but who hasn't ever held a nozzle himself.

    A better bet might be to ID another concrete guy in your area, and pay him to take a look.

    Good luck!
    Last edited by PoolDoc; 07-09-2014 at 04:44 PM. Reason: fix typo

  3. #3
    Join Date
    Jul 2014
    Location
    TN
    Posts
    2

    Default Re: HELP! New Gunite project has a "cold joint".

    Thank You!

+ Reply to Thread

Similar Threads

  1. concrete bottom pool with stainless sides, sealant for the concrete/wall joint?
    By kentuckynet in forum In-Ground Pool Construction and Repair
    Replies: 3
    Last Post: 04-14-2014, 03:21 PM
  2. Replies: 0
    Last Post: 12-24-2012, 03:16 PM
  3. Gunite already calcium deposits and small hairline cracks of both plaster and gunite
    By getittogether in forum In-Ground Pool Construction and Repair
    Replies: 4
    Last Post: 04-10-2011, 12:45 PM
  4. Expansion Joint Necessary?
    By jkapit in forum In-Ground Pool Construction and Repair
    Replies: 2
    Last Post: 09-28-2006, 11:20 PM
  5. De Filter Joint retainer
    By sml in forum Pool Equipment & Operations
    Replies: 1
    Last Post: 04-30-2006, 12:20 AM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts