Hello everyone,
I am the proud owner of a 15,000 gallon above ground pool. Can't wait to go swimming, but it is taking a while for the pool to get clear.
Here are the numbers I have using a 5-way drop kit:
Cl: 12.0 (?--I'm ballparking it based on amber color of reaction)
pH: 7.2
Total alkalinity: 120
CYA: 100 (I had to use a test strip for this)
I have balanced out my pH and my alkalinity by using acid and aerating. I know I need to add more shock, but I am afraid of bleaching my liner. How long does this process normally take? I have scooped out 99% of big debris and need to vacuum.
I must say that the cover fell in over the winter (this winter was our first winter in our house), and I neglected the pool after that. It was swampy green and you couldn't see an inch down. It has come a long way in a month.
Thanks to all!
EDIT: I forgot to add that I can see the bottom fairly well. It IS coming along, slowly but surely.
Bookmarks