We just recently had a 16 x 40.. 8 ft deep pool put in and had 7 ft. of concrete poured around it. The pool company installed the cantilever forms and was supposed to include 3 ft of the concrete in the cost of the pool which we paid for when the pool was installed. On the day the concrete was poured they informed us that we owed them 14,100.00 for the extra concrete. I thought it was a type o! They never discussed with us how much it was going to cost and we thought since in was only an extra 4 ft. it wouldnt be over 5, 000. so we didnt ask them for a price. The concrete wasnt stamped or tinted, just plain concrete which we found out cost 2,400. They havent even finished installing our diving board, slide or our automatic pool cover and havent been back to seal the concrete and they are asking for their money. We live in a very rural area of north central pa. so the cost seems extremely high! I'm not sure if anyone will be able to help but thought I would try. Does anybody have any experience with this and can offer some advice. Thanks, Shelly
Bookmarks