The chemicals I have are 3" jumbo tabs that are 99% trichloro-s- triazinetrione and 1% other.(available chlorine 90%). I have about 25 lbs of these.
The shock is 73% calcium hypochlorite and 27% other. ( minimum 70% available chlorine)
I also have about 20 lbs of soda ash.

The pool will be ready to fill Sunday morning after the epoxy paint has fully cured. It will be filled with the hose and fill valve which are plumbed into city water.

What's going to be my plan of attack here?

Thanks for any help
Darren