We are having an in ground pool constructed. We were told that it would only take 5 weeks and everything would be done. The contract was signed last summer. So it has been almost a year.
They were going to pour our decking, when the pool people put that on hold so they could install the waterfall,slide, and diving board. We were told that they had it in stock, turns out they did not and now 3 weeks later
we got a call saying the slide is going to be delivered on Friday, and they are going to install everything on Monday.

We were getting frustrated because our other backyard projects have been on hold until they pour the decking. So we were thinking of having the slide and diving board installed on deck. I guess we will see if it gets installed by Monday.