Hello all. I am hopefully a soon to be proud new pool owner. Tha plaster was finally done, and we started filling the pool. 50 hours later the water is half way up the skimmers. Our builders assistant then added chlorine (about 6 pounds). I think he also added a bottle of muratic acid(Not sure). Anyways, the pool looks now like our local river. Im kicking myself for not doing my own research, I guess I assumed these guys knew what they are doing.

My main concerns ane that the new plaster is stained. Ive read that the plaster needs time before chlorine is added. The pool guys are here now, and are trying to fix things with chemicals. I want nothing less the the perfect fix, even if that meand stripping the plaster and starting over. I dont want them doing a cover-up patch job.

Please share your thoughts
Im sure yall will be looking for more information/details, just let me know.

Thanks
Scott