How smart you are to get that great test kit so you have it from day one of pool ownership and to read ahead on pool care!

Have you tested your pH of your water yet? If not, do so and post the reading.

In a pool this size, each quart of 6% bleach will add about 1.8ppm of chlorine. Since you'll lose a lot to the sun initially until you get some stabilizer build up in the water, I'd suggest adding a 3 qt. jug as soon as it is filled. This will take you to around 5.5ppm. For the first week or so, you'll probably need to add chlorine morning and evening and if you are home, check it in the afternoon, too. Test and each time, add enough bleach to get back up to around 5-6ppm. After about a week, when the stabilizer has dissolved, you'll be able to go to testing and adding bleach in the evenings only.

For starters, I'd add about 2 lbs. of stabilizer slowly through the skimmer. Then keep your pump running 24/7 for the first 4 or 5 days while it is dissolving.

Come back with more questions if needed and also keep us posted on how things are going. Welcome to the forum, by the way!

P.S. (Actually, if you're not gonna be finished filling today, I'd still go ahead and get some bleach in there. It is amazing how fast an un-chlorinated pool can turn green! You can walk around the perimeter of the pool slowly pour in some bleach as far from the sides as you can reach and then use a clean broom or something to stir the water up.)