Hi all,

We're planning a month long trip this summer. I don't want to come home to pea soup so I was planning to open, stablize, and then put the pump on a timer. I use the BBB method and have someone who can add CL & test as needed for me while I'm gone. I'd rather not run the pump 24/7.

Can someone tell me what's the minimum and/or optimum amounts of time to run the filter on a 16,000 gal AG pool?

Thanks,
CoffeeBean