Greetings, I am doing some basic information gathering for a new Intex Ultra Frame style pool (gravitating towards 18') and had a basic question on leveling. If there is a thread dealing with soil / level prep please point me to that too.

I have an area that is fairly level and should encompass the pool plus a 2' outer ring around the pool. but does have some sloping. Currently a 3 seat swing set in right in middle of proposed pool area. There are three 'grooves' where the kids have compacted soil and lawn under the swing seats. These grooves are probably 3" below the basic level mark of the ground and would be in the center of the pool area.

It seems to me (never having leveled any soil) that if I remove the St Augustine grass to get to the soil this may get me close to the level of the compacted grooves. I should just dig down to that level as opposed to building up the low spots?

Does that make sense? Dig down or up to achieve level?