Re: Hayward Pump questions
Hm, this thread has strayed off topic, but as usual, I'm learning more and more!

Originally Posted by
mas985
However, 17 PSI should be more than enough pressure to close the VRV and prime the panels unless there is a lot of head loss between the filter and VRV. What size pipe do you have going to the panels? Where is the VRV located?
I have about 40 feet of (2") PVC level ground, then the 25' rise to the panels, then the same returns. The VRV is at the top most position of the panels.

Originally Posted by
mas985
Sometimes you can move the valve to the supply side of the panels so it closes off easier.
This sounds interesting. I may have to try this.
Regards,
Ron [ muvipix.com ]
Bookmarks