So HTH told me I had to wait until the the free chlorine level was below 1 to add the metal control...is this correct?

My chlorine is measuring around 10 ppm from the intiall shock dose I added I guess...I do not have any stabilizer in there...how long should this take to return to a low enough level?

Also waht level of chlorine is safe to swim in?

Thanks