Sorry for the delay
The patch should cure 24 hours, then be lightly acid washed to liberate any material that hasn't fully bonded to the pre-existing crete. Then allow ~ a day for the floor to dry before applying the paint
I'm out for the weekend on Friday (class reunion) but will be back next week