1. Suppose the CC is > 0.5 and there's no algae condition. Do I still need to use the "Ben's Table" , or should I use the 10x CC rule? I'm asking because with my CYA level of 56 , the 20 ppm FC level off the Table seems high. How long would it take for the FC to dissipiate and thus enabling a safe for swimming level of FC?
If the CC is only a little high -- say 1 ppm or so -- then I'd just wait for the next day to see if sunlight helps get rid of it along with time from exposure to normal chlorine levels. If it's really high, then that's unusual and a shock level could be tried, but it could be persistent chlorine that virtually nothing but dilution will get rid of -- that's rare except in some indoor pools. I don't think the 10x rule is useful for CC, period.
2. If CYA is stable, as I've read here, and since it protects FC from UV, then how come it is still mentioned here in many places that one should shock in the evening, otherwise the FC will be quickly destroyed by the Sun's UV?
Quickly is a relative term. You are right that it isn't so quick and you can shock in the morning if you want to, but if sunlight cuts down chlorine over the day by, say, a third, then a third of a high FC shock-level number is quite a lot. If you shock at night, then you get the entire night at that high level compared to the daytime where only part of the day is at that high level and some of the day is at a lower level. It's not a huge deal -- just an optimization.
3. I'm sure that no such thing as "average bather load" is accurately defined, and that other bio-enviromental factors are involved, but, what frequency can I expect of FC addition in order to mainatin my normal FC level? Is it daily, or twice a week, or what?
That depends on the CYA level since sunlight is the biggest factor, generally more so than bather load unless you've got many people using the pool (not just 1-3). Dupont defines high bather load at < 1000 gal/bather/day, medium bather load at 1000-5000 gal/bather/day, and low bather load at >5000 gal/bather/day. This assumes some unknown amount of time, probably between 30 minutes and an hour of a bather in the water "per day". For manual dosing, one usually needs to add chlorine every day or two depending on CYA level and sunlight exposure. With a pool cover, one can usually add chlorine twice a week (that's my situation).
4. What's the best thing to do when one goes on a 1- 2 week vacation and the pool is left unattended?
Shock before you leave? Add trichlor tablets?
You can automate "liquid" chlorine dosing by using The Liquidator talked about in this thread which may last 2 weeks if there's no bather load. Otherwise, you either need to get someone to add the chlorine manually or you can use Trichlor tabs/pucks, but even with tabs/pucks the chlorine will likely only last about a week or week and a half -- probably not 2 weeks. Also, Trichlor is very acidic so you'll want to start out with the pH a bit higher. You can shock and after the chlorine drops some (over one day), then add a full dose of PolyQuat 60 algaecide similar to what is done on closing. Probably the best thing (other than having someone add chlorine) is having a pool cover that is opaque to sunlight as that can cut down the chlorine usage to 0.5 ppm per day or so.
Please let me know if a FAQ answering all these questions and other, related ones is posted here or elsewhere. If not, I'm sure it would be very helpful and would save a lot of time and bandwidth.
I don't think this info is in one place that I can find, but it is in various posts.
Bookmarks