Re: Need order of operations
Hi, I would do cove, sides and then bottom. The cove needs to snap into the bottom rail so I would do that first. I would then do the walls. If you are using an overlap liner be sure the foam is down a few inches from the top, allowing plenty of room for the coping. With all that done I would do any final smoothing needed and then install the bottom.
This is an all out liner install, any way we could get some pictures? I bet they would be very helpful to many.
Dennis
AG pool installer
Arizona
Bookmarks