The excavation started yesterday, Friday and they are anticipating Gunite next Tuesday. We'll see how it goes. The weather has been very good here for the past week or so.
Yes another pool build! Mine has just started and thought I would post some pics.
SPECS:
95 Perimeter - Approx 467 sq ft Surface Area
14,500 Gallon Pool (need to remeasure as I made it bigger than the original 85' at layout)
750 Gallon Spa
3.5' to 5' to 4' Pool depth
SPA
8ft Spa - Raised 1ft
51 Sq Ft Surface Area
5 jets - 100w light
Air Blower
Paramount MDX Safety Drain
12" Thick Gunite Wall between Pool and Spa
PLUMBING
Pressure Testing all Plumbing Lines and Connections to 35 psi minimum
Poured in Place Steel Reinforced Concrete Pad for Pool Equipment
Paramount MDX Dual Safety Main Drain with ADR under deck Canister
Surface Skimmers (2) with Separate Runs to Pump
Auto Fill System
4 - Surface Returns
STEEL
½” Rebar 4-Bar Box Bond Beam around pool perimeter
3/8" Rebar 8" OC continuous on walls and floor
3/8" Rebar Deck Dowels for continuous tie in to deck
EQUIPMENT
Pentair 420 sq ft Cartridge Filter
Pentair Intelliflo 4x160 Multi-speed pump
Pentair EasyTouch 4 Control System
Pentair EasyTouch Wireless Controller
Pentair IntelliChlor IC40 Chlorine Generator system
Pentair MasterTemp Low NOX 400 Heater
Pentair Legend Platinum Cleaner with 3/4 HP Pump
Pentair 320 Erosion Chlorinator & Paramount Ozone System
Polaris Air Blower for SPA
(2) 300 Watt Pool Lights
GUNITE
Gunite Structural Pool Shell with 6 sacks to the cubic yard, including: 6" thick walls and floor, 8" thick coves
Transferable Lifetime Warranty from Gunite Company
Up to 36' Steps in Shallow End of Pool
TILE & COPING
Flagstone Coping
6" Waterline Tile
Overflow Vent in Tile Line
INTERIOR FINISH
Wet Edge Primera Stone with 10 year warranty
DECKING
All Concrete Decking to include #3 @ 16" OC steel reinforcement tied to steel form gunite shell,
with 4" minimum thickness, polyfoam layer between deck and bond beam and deck piers at deck perimeter.
Deco Seal at joint between deck and coping
SUNDEK surface with Flagstone inlays
620 Sq Ft + Planned
CLEAN UP/START UP
Clean up of construction debris, berm soil around pool and fill in tire tracks in yard, powerwash/scrub driveway & street
Initial Equipment Start Up, Chemical Balance
Pro Test Kit, Leaf Net, 16' Telescopic Pole, Brush, Chemical Balance
Pool School with Written and Verbal Instructions for Pool Operation, Maintenance and Chemical Balance,
Lien Waivers/Warranties signed from all sub contractors
Overhead View
Table View
Right Side of Yard
Middle of Yard
Left Side of Yard
More to follow...
Last edited by 26theone; 04-22-2007 at 07:02 PM.
Pool Layout
Just after Dig
Working on Steel
Plumbing Starting
The excavation started yesterday, Friday and they are anticipating Gunite next Tuesday. We'll see how it goes. The weather has been very good here for the past week or so.
Last edited by 26theone; 03-03-2007 at 10:03 AM.
Roger,
Congratulations!!!! Nice design and looks like it will tuck in your backyard with room to spare. What are all of the specs on your pool? Keep the pics coming.
Nice design! Looks like they are on the way. Keep posting updates!
Steve
The gunite is complete and the equipment is installed. Next step is coping, tile, and electrical work.
Plumbing
Steel Complete
Gunite being applied
Gunite Complete
I have a sprinkler in the pool to wet the gunite every 6 hours or so.
We're debating Primera stone too, unfortunately there are very few pics of it availble, and the ones on wetedge's website are hard to judge by... My PB is filling a pool this week with it though, so we'll get to see at least one in person.
Tile, Coping and Electrical finished last week. I need to upload a new picture.
The deck forming should be completed today with the concrete pouring later this week if the weather holds out.
Interior pool finish and fill is scheduled for next week.
Then spray deck and cleanup.
We are looking at finishing in less than a month!
The deck concrete was poured today but it was too dark to take pictures. I have some other pictures of the progress. We are hoping to finish soon.
Spa
Deck Prep
Mission Control
Table Area
I have more pictures posted to http://stroudsonline.spaces.live.com
fyi to any who care, I am continuing my pool build documentation at
http://www.troublefreepool.com/viewtopic.php?t=18
The pool is complete...Just need to seal the flagstone and we will be ready for summer!