Day 2 - 2/20
Today they just did some rough plumbing. The gunite goes in tomorrow at 7:00AM.
I will post some pictures of the gunite tomorrow. I hope they don't cut my cable line again!
Steve
This is a contunition of my previous thead. In this thread I will chronicle the build of my pool.
Day 1 - 2/19
Well they started the build on Monday 2/19. I had off for president’s day so that worked out nicely. They started work at 6:30AM. I am sure my neighbors were not amused! They started digging around 7:15 and finished around 2:30-3:00. My cable/Internet access only lasted about 15 minutes into the build!
The steel also went in that day and finished around 8:30. It is really amazing how quick they work. Here are some pictures of the yard before and after the work yesterday.
Left side of yard.
Right side of yard
Laying the pool out
Making some nice progress
Almost done with the steel
Day 2 - 2/20
Today they just did some rough plumbing. The gunite goes in tomorrow at 7:00AM.
I will post some pictures of the gunite tomorrow. I hope they don't cut my cable line again!
Steve
Steve,
Looking good. I lost cable twice. Once during the dig and then a second time during the hard plumb. Nature of the beast. Looks like you got some good spacing on the bubblers. Keep us posted. Weather should hold out for you. Good Luck
The bubbles are different then normal bubblers. On Kelly's advise I got my PB to plumb for crystal fountains foam jets. They have a water feed as well as an air feed. They look like they will give a very nice effect and the bonus is they are flush to the floor instead of sticking up like an eyeball return. They are about 4' apart. I actually had them shift them a bit before the gunite was sprayed. One was too far forward. Thanks!
Steve
Day 3 - 2/21
Yesterday they did the gunite. It was a very cool process to watch. They guys really are artists. Overall I am thrilled with the way the pool looks. I forgot to bring in my memory card so I will have to post pictures later. I think they are not planning much for the rest of this week. I think they said they are going to do the gunite cleanup today or tomorrow and Tuesday next week the rock features go in. That is a 3 ton water wall, 16' of moss rock accents and a large jump rock. I will post pictures later today.
Here are the pictures of the work done on day 3
Getting the spa ready and spraying the tanning ledge
Working the spa
Working the deep end
We have a shell!
Steve
Last edited by skamp; 02-23-2007 at 08:27 AM.
Steve,
Wow they are moving fast on your pool. It is looking great. You obviously got a good builder, well from what we can tell so far... we'll see how it works when it's all done.
Eric
That seems to be what happens. Our back-fence neighbors had a (I guess) gunite pool done. Once the concrete was in, it sat for weeks, but when they did the surface layer, they had the water in it almost immediately--I gather some surfaces cure better if they are kept wet so they don't dry out too fast.
Carl
I have good confidence in the builder. They have been around since 1981, have no bad marks from the BBB and everything one I spoke with that got a pool from them has had good things to say. They did move fast to start but that is about the PB getting the subs lined up. It will be slower the next few weeks.
Steve
Steve,
Push your builder hard to get it done. Mine was complete within 29 days after the dig and I had a week between the dig and gunite. Water features will obviously take a little extra time but Spring is fast approaching down here and you know they tend to be wet. It looks great. Keep the pics coming.