+ Reply to Thread
Results 1 to 10 of 58

Thread: Steve's pool build status - Work started 2/19/2007!

Hybrid View

  1. #1
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by divnkd101 View Post
    Steve,

    Your pool and surround just turned out great. FYI, how did the spacing on the bubblers turn out??? Any interference between them at all? Just curious. Thanks for sharing your build.
    The spacing is great. I need to take some action shots. If I turn down the waterfall and weeping wall I can get the bubblers up around 5-6' Thanks!

    Steve

  2. #2
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    I just wanted to post some final pictures of my pool, kitchen and porch project. The delay to complete the last few thing was my fault. The granite contractor took way longer then I expected which in turn delayed the pool company from completing the rock work. I still have few small punch out items that need to be addressed but overall I am very happy with the end result.










  3. #3
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Pictures continued









    I would also like to say the support on this forum has been great. My pool would not have turned out so nice without the input from all of you. Thanks!

    Steve

  4. #4
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Steve,

    I'm getting ready to build my BBQ, is the granite counter top hot to the touch? My BBQ will not be protected from the sun. Let me know.

    Thanks,
    AL

  5. #5
    skamp is offline Registered+ Thread Analyst skamp 0
    Join Date
    Aug 2006
    Location
    Cypress, TX
    Posts
    94

    Default Re: Steve's pool build status - Work started 2/19/2007!

    Quote Originally Posted by No Need View Post
    Steve,

    I'm getting ready to build my BBQ, is the granite counter top hot to the touch? My BBQ will not be protected from the sun. Let me know.

    Thanks,
    AL
    Yes it is pretty hot but I would imagine any countertop would be. There are three unbrella holders in the kitchen so when there is an umbrella it is fine. I need to go buy some larger ones so I can overlap the entire kitchen.

    Steve

+ Reply to Thread

Similar Threads

  1. Deer in Scuba Steve's pool
    By DJK555 in forum Pools, Pets and Creepy Critters
    Replies: 1
    Last Post: 09-28-2010, 05:19 PM
  2. Welcome year 2007 agp newbies
    By hrsdennis in forum Above-Ground Pool Construction & Repair
    Replies: 4
    Last Post: 03-21-2007, 06:03 PM
  3. Steve's pool project 1-24-07
    By skamp in forum In-Ground Pool Construction and Repair
    Replies: 49
    Last Post: 02-20-2007, 01:30 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts