Well last week I completed the landscaping. It took 6 days with 3 helpers each day to complete the following.
- Landscaping
- Repair french drain
- Rock work
- Completly redo 3 zones of my irrigation system
- Resod the front yard and back side yards
- Install flagstone walkway and rainbow gravel between fence sections where the pool equiptment is (~25 feet)
The only things left to do are outdoor kitchen and the firepit. The big holdup has been the granite countertop people. They were backlogged so all the rock work has to wait until the countertops are done.
Top view from 2nd story of my house
View from left side
View from right side
Finished covered patio
I will post more pictures once the rock work gets done.