Day 9 - 2/28

Today they completed the plumbing and set left it pressurized to test for leaks. There is a small hole in one of the pump housings under the inlet. I will have them replace the pump.

Lots of pipes and valves!



On the right are the valves for the water feature. They include.

1. Waterfall
2. Weeping wall
3. Bubblers in tanning ledge
4. Bypass back to return if I want to reduce the overall flow to the water features.



Stubout for the gas and water going to the outdoor kitchen.



Stubout for the firepit



Tomorrow they are doing the rock waterfall and accent rocks. Friday they are going to do the coping, waterline tile and spa. Monday the electric is going in. Also Friday my patio cover construction starts! I will post more pictures soon.

Steve