Just an update on our pool... final inspection was today and the inspector caught a couple of minor things.
1. Double gate didn't have a stop for the down rod to lock it in the down position. (I put in two L brackets and even had a hole to put a pad lock so nobody can open the down rod... ha we'll see how he likes that!)
2. Door alarms needs to be screwed into place, I had used double sticky tape, which was included with the kit. (Well if they sell kits that meet code why include the tape if you can't use it?!)
3. One window had it's latches too low so need a way to prevent it from opening more than 4". (Will install a screw in the track for this)
So we are up for the inspector to come out tomorrow now to re-inspect the changes. After that they can finish the pool - Carribean Blue pebble tec. Tomorrow the plumbers should show up to install the in-floor cleaning system heads and other plumbing fixtures.
Wish us luck, we're trying to get pebble tec before the weekend so the pool will be filled for xmas!
Oh almost forgot, a crew was out today to clean out the pool and spa. Took them a while to get all the junk out from all the messy work. This included removing the dirt and morter that had built up from installing the deck and the rock features. The pool looks all clean now and is begging for the pebble tec.