One more block wall to finish, then I'll finally be able to get my pre plaster inspection.
The stone work is finally done, they only need to add the tile for the pools water line.
matching fire pit.
![]()
One more block wall to finish, then I'll finally be able to get my pre plaster inspection.
The stone work is finally done, they only need to add the tile for the pools water line.
matching fire pit.
![]()
Bookmarks