+ Reply to Thread
Page 1 of 7 1 2 3 ... LastLast
Results 1 to 10 of 63

Thread: eljefe281's (Jeff's) pool project

  1. #1
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default eljefe281's (Jeff's) pool project

    Specifications:

    In-ground gunite
    Rectangular
    11' wide x 30' long
    3'6" - 4'6" - 5'6" deep
    18" raised bond beam at deep end
    18" wide in-pool bench in deep end
    3 steps, 12" deep x 12" high x 7' wide
    7' square spa, raised 6", with step
    Section of lowered spa bench
    Pentair FNS Plus 60 sqft DE filter
    Pentair WhisperFlo 1 HP two-speed main circulating pump
    Pentair WhisperFlo 1 HP spa jet pump
    Pentair WaterFall specialty pump for sheer descent waterfalls
    Jandy LX 400,000 btu/h gas-fired heater
    Jandy Purelink 1400 salt water chlorine generator system with PDA PS-8remote control
    Polaris QT 1.5 HP blower
    Two 24" Polaris Powerfalls (sheer descent waterfalls)
    Two Pentair SAm lights in pool
    One Pentair SAL light in spa
    Two Pentair Bermuda skimmers
    Eight main drains (four in pool, four in spa)
    Six returns in pool
    Three returns in spa
    Eight spa jets
    Auto-leveler
    Pre-plumbing for pressure-side cleaner
    Noblecast pre-cast concrete coping
    3" tile for waterline, raised beam, spa skirt, and bench/step accent
    Diamond Brite Tahoe Blue finish
    Pea gravel decking

    I didn't manage to get out this evening and take any photos of the recent progress, but these should get things started.







    Last edited by eljefe281; 10-04-2006 at 11:33 PM.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  2. #2
    CanuckPool is offline *Removed User* Weir Watcher CanuckPool 0
    Join Date
    Jul 2006
    Posts
    224

    Default Re: eljefe281's (Jeff's) pool project

    Sounds Impressive, is it normal to have that many main drains for a 11x30 pool?

  3. #3
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    I wouldn't think so, but I've got more pumps than normal.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  4. #4
    CanuckPool is offline *Removed User* Weir Watcher CanuckPool 0
    Join Date
    Jul 2006
    Posts
    224

    Default Re: eljefe281's (Jeff's) pool project

    True, you have more horsepower in those pumps than my lawnmower!

  5. #5
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Last edited by eljefe281; 10-04-2006 at 11:40 PM.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  6. #6
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  7. #7
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project



    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  8. #8
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  9. #9
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  10. #10
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

+ Reply to Thread

Similar Threads

  1. Pool project
    By Smokey in forum --cleanup--
    Replies: 1
    Last Post: 10-02-2012, 12:04 PM
  2. AL's Pool Project 10-17-06
    By No Need in forum In-Ground Pool Construction and Repair
    Replies: 45
    Last Post: 04-08-2007, 09:06 AM
  3. Subcontracting your own pool project?
    By minddeal in forum In-Ground Pool Construction and Repair
    Replies: 14
    Last Post: 02-28-2007, 09:15 PM
  4. Steve's pool project 1-24-07
    By skamp in forum In-Ground Pool Construction and Repair
    Replies: 49
    Last Post: 02-20-2007, 01:30 PM
  5. That massive pool restoration project
    By peppercorn in forum In-Ground Pool Construction and Repair
    Replies: 8
    Last Post: 01-04-2007, 09:10 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts