    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  2. #52
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project







    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  3. #53
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project





    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  4. #54
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    207

    Default Re: eljefe281's (Jeff's) pool project

    I don't know how I missed this post. It turned out great. I like the simple geometric shape; it's a nice clean look. Enjoy!
    Site owner -- www.troublefreepool.com

  5. #55
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    Thanks, Sean. I'm pleased with the way it turned out.

    And, like the B family, we heated the pool over the Thanksgiving weekend. At one point, we had 13 people in that tiny pool. It was a blast.

    It's a strange feeling when the pool water is warmer than the surrounding air.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  6. #56
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: eljefe281's (Jeff's) pool project

    Your pool came ot real nice!

  7. #57
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    Thanks! I appreciate the thought.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  8. #58
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: eljefe281's (Jeff's) pool project

    Jeff,

    What did you use for the plaster finish?

  9. #59
    Join Date
    May 2006
    Location
    Sugar Land, Texas
    Posts
    183

    Default Re: eljefe281's (Jeff's) pool project

    Quote Originally Posted by No Need View Post
    Jeff,

    What did you use for the plaster finish?
    It's Tahoe Blue Diamond Brite.
    Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.

  10. #60
    No Need is offline Registered+ Thread Analyst No Need 0
    Join Date
    Aug 2006
    Location
    San Dimas, Ca
    Posts
    57

    Default Re: eljefe281's (Jeff's) pool project

    Quote Originally Posted by eljefe281 View Post
    It's Tahoe Blue Diamond Brite.
    Is is paint or a 3M or?

+ Reply to Thread

Similar Threads

  1. Pool project
    By Smokey in forum --cleanup--
    Replies: 1
    Last Post: 10-02-2012, 12:04 PM
  2. AL's Pool Project 10-17-06
    By No Need in forum In-Ground Pool Construction and Repair
    Replies: 45
    Last Post: 04-08-2007, 09:06 AM
  3. Subcontracting your own pool project?
    By minddeal in forum In-Ground Pool Construction and Repair
    Replies: 14
    Last Post: 02-28-2007, 09:15 PM
  4. Steve's pool project 1-24-07
    By skamp in forum In-Ground Pool Construction and Repair
    Replies: 49
    Last Post: 02-20-2007, 01:30 PM
  5. That massive pool restoration project
    By peppercorn in forum In-Ground Pool Construction and Repair
    Replies: 8
    Last Post: 01-04-2007, 09:10 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts