It should only take about 1/2 hour to dry the top side, then just pull it over itself half way, this should dry half the other side and the concrete it was lying on, then flip it to the dry spot, and everything should be good half an hour later.
Concrete and cover should be fine I do mine on the grass or the gravel driveway