I believe the 1 hp or 3/4 hp two-speed would be plenty, but I think it would be a good idea for you to wait for some of the more experienced members on the board to chime in.
As far as brands are concerned, I guess any of the major names are good - Pentair, Hayward, Jandy.
I am getting Pentair pumps.
If you call Pentair tech support, they will help you select a pump. I imagine that's true for any of the other companies as well.
Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.
Basic steps for selecting a pool pump:
How many gallons of water do I need to turn over in one day? (Twice your pool volume)
How many hours per day will I run my pump? (Entirely up to you - 8-12 is typical)
Flow rate required = (gallons) divided by (hours) divided by (60 minutes per hour) = gallons per minute
Assume a system TDH of 45-65 feet. If your circulation system has a lot of valves in it, a lot of piping elbows, and/or a long run from the equipment to the pool, choose a number on the higher end of that range. Make your best guess. (It should be noted that this is a shortcut, but one that is fairly well accepted by the board).
Look at the pump curve for a particular pump you are considering. How much flow will it deliver at the TDH you selected? Compare that to the flow rate required you calculated above.
Note that two-speed pumps will have two pump curves, usually on the same graph. At low speed, use a TDH approximately one-fourth (25%) of the TDH you selected above. Look at the pump curve for a particular pump you are considering. How much flow will it deliver at the TDH you selected? Compare that to the flow rate required you calculated above.
Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.