Sean, I was not present when they started. My PB told me they got started around 9:00 AM in the morning. After everything was masked off, textured and paint was done, the PB estimated 3 hours. My wife is a school teacher and was home by 4:00 PM. She walked on it immediately. The PB told us as long as it is not tacky to the touch that it is dry enough to walk on. I am forcing them back out to put a second coat of paint on because after more detailed inspection, I can see tiger stripes (lack of paint in some areas). They will be done before 10 AM this morning.
Bookmarks