PB says he is done with job. He is coming back tomorrow or next week with his total bill. We had extra concrete work and he said that he has not calculated sq ft yet. He did remove some of the rough areas behind the liner today. However, after he left, I counted 17 (each one is about the size of a large shelled whole cashew nut) rough spots or rocks about 36 to 38 inches from the top edge of the pool.. They are spread out over about a 5" x 30" area near the bottom of the polymer wall on the deep end.They will not flatten out when I push on them with my thumb.
PB says there is nothing that can be done to remove the stains on the deck- that we'll just have to wait for the stains to fade. Sure, okay, and I'm thinking - you can wait to be paid, too, until the stains fade! We have a concrete specialist coming out tomorrow for a second opinion on stains, hairline cracks, and today I noticed the deck had separated from the steps and spa- just a hairline break of the seal. The deck is less than one week old! PB plans to come back with final bill tomorrow evening, but we may put him off. However, we are waiting to confront him with our complaints until after he presents us his final bill. We don't want him to try to up it- when he gets mad.
Oh yeah, did I mention that our contract specified a side mount 500 lb hayward filter? But we got a top mount. PB claims that Hayward quit making the side mount. We called the distributor that was on the address label, and he said the filter is still available, and that he had 3 in stock! Can't wait to see the look on the PB's face when we tell him that! Distributor informed me that the filter I got cost the PB about 180 bucks less, than the one we had specified in the contract. I could go on and on and on.![]()
Bookmarks