    Default Re: SeanB.'s Pool Build

    Quote Originally Posted by SeanB. View Post
    Well, barring bad weather, they will be pouring our deck tomorrow. I understand that once the concrete is poured, we need three days with no rain before the top coat can go on. Here's hoping for a dry weekend.
    Unbelievable...how many days since the dig now?

  2. #2
    SeanB. is offline --General User-- Weir Watcher SeanB. 0
    Join Date
    Aug 2006
    Location
    Missouri City, Texas
    Posts
    207

    Default Re: SeanB.'s Pool Build

    Quote Originally Posted by Ready2swim View Post
    Unbelievable...how many days since the dig now?

    The excavation began on the 7th so we are 22 days in, which isn't too bad considering we had a couple of rain delays. Hopefully we'll be putting water in by mid week next week. They originally quoted us six weeks with a guarantee of no longer than eight. I think they will finish well within the 6 week period. I'll have some more pictures tonight.
    Site owner -- www.troublefreepool.com

+ Reply to Thread

Similar Threads

  1. About to build a IG pool......just a bit nervous!
    By B.S.. in forum In-Ground Pool Construction and Repair
    Replies: 11
    Last Post: 06-17-2011, 11:05 PM
  2. Want to build my own pool
    By fta123 in forum In-Ground Pool Construction and Repair
    Replies: 1
    Last Post: 06-16-2011, 08:41 PM
  3. ehorn's pool build
    By ehorn in forum In-Ground Pool Construction and Repair
    Replies: 29
    Last Post: 01-07-2007, 08:36 PM
  4. chazas' second pool build
    By chazas in forum In-Ground Pool Construction and Repair
    Replies: 0
    Last Post: 12-04-2006, 04:57 PM

Tags for this Thread

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts