Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.
So, I finally got around to taking a picture of the completed gunite. As you can see, I just finished wetting it down and the water is starting to accumulate in the deep end.
A little closer:
And here's one of the equipment with electrical completed. The box lying there is the blower for the spa and the cable hanging on the back is the cable which was cut and has since been repaired. I'm going to wait until the rest is completed before burying it again.:
![]()
Site owner -- www.troublefreepool.com
Looks great, Sean!
Man, they really shoehorn all that equipment in there, don't they?
Pool owner - contract signed 21Aug2006; HOA approval granted; complete - existing patio demolition; excavation; rebar; embedded plumbing; gunite; plumbing; electrical; tile and coping; decking; plaster; pool fill; acid start-up; regular start-up; pool school; gas meter upgrade; additional of salt; PDA remote programming.
Yeah, the pads were pre-formed concrete squares, so it's probably the same size regardless of how much equipment you have. Mine took two squares. I have two pumps a blower, a swcg, a heater and a filter. If I had anymore, they'd have needed another square. lol Actually I'm glad though - that's that much less space used up in my yard.
Site owner -- www.troublefreepool.com