Quote Originally Posted by wbrady
It is a front end loader and that is the only machine they used. These guys told me that it takes longer to use a bobcat.
You bet it does!!! Look at the size of the loader and the bucket, it'll grab 3 to 1 what a mid sized skid loader will in one scoop.

A good operator will excavate very close to finished dimensions leaving just a minimum amount of trimming necessary in any size machine he's intimate with, you'd be shocked to know how much finesse you can exercise with a large machine.

See Ya,
Kelly