Hi Robert,Originally Posted by rmeden
A little of all 3 actually. I kept a string line tied to a tree behind the pool at the existing deck height and would periodically check during the excavation by streching the string to the reference point to see if I was close (you can see the string tied to the tree in one of the photos).
I kept scraping with the machine until the measurement matched the existing deck. It turned out right on the money (the luck part).
Regards,
Frank
Bookmarks