I am thinking that it would be the best to just clean and go. Problem is, that i would like to fill in any voids under the deck for stability. If possible without tearing the deck out. That being said, I am assuming that there are holes that need to be made and then covered. Which will leave more patch jobs visible. Does anyone know of a way to backfill in a slab?I'm thinking that if backfilled, I could seal the cracks and have the deck resurfaced. Someone suggested resurfacing, which sounds like a plan to consider. The pool surface is recently ( 4 years ago ) resurfaced with DiamonBrite, So it is in pretty good shape. (meaning I am not redoing it) That just leaves the deck and associated problems, which everyone has been very, very helpful with. A friend suggested re-attaching the setp with 3 stainless steel rods for strength and a good epoxy/concrete. Of course, I would have to drill holes for said rods in the step and pool wall to a point for support. Is this a consideration or should I just bite the bullet and get a contractor to reform the step ( which seems to be the other best option I have seen ). This has been quite an education in itself. I appreciate all the help!
Bookmarks