Thread: Getting a new fiberglass pool

Hybrid View

  1. #1
    mbar's Avatar
    mbar is offline Lifetime Member Whizbang Spinner mbar 3 stars mbar 3 stars mbar 3 stars mbar 3 stars
    Join Date
    Dec 1969
    Location
    Ashland, PA
    Posts
    1,009

    Default Re: Getting a new fiberglass pool

    Northeast PA
    16'x32' kidney 16K gal IG fiberglass pool; Bleach; Hayward 200lb sand filter; Hayward pump; 24hrs; Pf200; well; summer: none; winter: mesh; ; PF:7.5

  2. #2
    Join Date
    Jul 2006
    Posts
    49

    Default Re: Getting a new fiberglass pool

    O.K. Marie. I'm starting to feel better after seeing your pool. It's gorgeous! I've never heard of using porcelain tiles before but it totally makes sense. Is there a reason you don't have a cantilevered edge? I thought that cantilever was the "standard" way to install. Also, did you have any problems with the installation like the pool being unlevel or leaks? And finally, did you pay in full before start-up? Our contract only leaves about $1,500 for a punchlist. Thanks so much.

    Tisha

  3. #3
    mbar's Avatar
    mbar is offline Lifetime Member Whizbang Spinner mbar 3 stars mbar 3 stars mbar 3 stars mbar 3 stars
    Join Date
    Dec 1969
    Location
    Ashland, PA
    Posts
    1,009

    Default Re: Getting a new fiberglass pool

    I don't know what you mean by cantilevered edge. My pool had a regular edge, but at first we had concrete around the pool, but the concrete was bad - it was pitting and flaking off. The company I had put in the pool also put in the concrete. After 2 years he finally admitted that the concrete was bad and wanted to redo it - but I chose to get my money back for the concrete, and then added more (much more) and had the tile put around it, because I didn't want to disturb the pool. The tile is a little higher than the pool which is a pain, but it was the only way the tile guy would do it - he didn't want to tile over the pool edge. The installation for the pool was great - we had no problems, no leaks, it is almost level, maybe off 1/2 to 1" on one side. I am completely happy with it the way he installed it. I did pay 1/2 down, then the other 1/2 when the pool went in. My pool included the pump & filter, heater, ladder, 3 ft of concrete around it & start up chemicals - unfortunately he used baquacil! All in all I would use the same pool company again, although the owner now has sold it to someone else, and I don't know how they are. Hope this helps, feel free to ask any other questions.
    Northeast PA
    16'x32' kidney 16K gal IG fiberglass pool; Bleach; Hayward 200lb sand filter; Hayward pump; 24hrs; Pf200; well; summer: none; winter: mesh; ; PF:7.5

  4. #4
    Join Date
    Jul 2006
    Posts
    49

    Default Re: Getting a new fiberglass pool

    Hi Marie. Cantilever means that the concrete goes over the fiberglass lip of the pool. My PB just called today and said that he is pushing back the start date again. How long did your install take? We're expected to pay the bulk of the total cost as soon as they show up with the pool, before they actually install it. Was this your experience? Thanks.

    Tisha

  5. #5
    mbar's Avatar
    mbar is offline Lifetime Member Whizbang Spinner mbar 3 stars mbar 3 stars mbar 3 stars mbar 3 stars
    Join Date
    Dec 1969
    Location
    Ashland, PA
    Posts
    1,009

    Default Re: Getting a new fiberglass pool

    Yes, I think it was the second payment when the pool went in- it was 7!/2 years ago, so I am not too sure. Half was put down before the work started, and the rest when the pool went in the ground. I still had to pay for the rest of the concrete, which was separate from the quoted price of the pool. The pool went in on the same day. As soon as it was in they measured it to make sure it was level, then back filled around it and started to fill it right away. It was lifted in with a crane! It looked like a big bathtub. I know that it was then filled and then the pump was started up. It was a while before they did the concrete. It is really hard to remember the exact sequence - but I know it was really fast.
    Northeast PA
    16'x32' kidney 16K gal IG fiberglass pool; Bleach; Hayward 200lb sand filter; Hayward pump; 24hrs; Pf200; well; summer: none; winter: mesh; ; PF:7.5

  6. #6
    keithw is offline Registered+ Thread Analyst keithw 0
    Join Date
    May 2006
    Posts
    64

    Default Re: Getting a new fiberglass pool

    I've got a CPC 12 x 24 that I installed myself. Upkeep on it is very easy. I did have to add vitamin C to kill some stains early on but it's been pretty stable since then. I can see hte advantages to a cantilevered edge. We tend to lose water when a quite a few people get active in the pool and an overhanging edge would eliminate that. Here's a link for my pool install,

    http://s36.photobucket.com/albums/e4...vab/?start=all

+ Reply to Thread

Similar Threads

  1. Off Level Fiberglass Pool
    By Rudy2012 in forum Above-Ground Pool Construction & Repair
    Replies: 3
    Last Post: 06-05-2012, 06:36 PM
  2. Fiberglass pool
    By Aboabdo in forum Pool Startup, Shutdown, & Winter Operation
    Replies: 2
    Last Post: 08-01-2011, 04:57 PM
  3. Concrete in new fiberglass pool
    By Tishabiondy@natlmail.com in forum In-Ground Pool Construction and Repair
    Replies: 0
    Last Post: 09-03-2006, 01:20 AM
  4. Fiberglass Pool
    By DONNIE in forum Dealing with Alkalinity and Calcium
    Replies: 7
    Last Post: 07-12-2006, 12:02 AM
  5. Fiberglass pool question - can they pop out?
    By tybeeware in forum In-Ground Pool Construction and Repair
    Replies: 1
    Last Post: 06-05-2006, 12:32 PM