When the pool company installed our round AG 24 X 54 yesterday, the guy advised us to push all the remaining dirt along the sides of the pool. He said that it would help the pressure (created from the water)on the walls. They had to dig down 16 inches to get the site level which you can imagine is a LOT of dirt. Should we do this? My thought was the soil would eventually make the metal disintegrate. Also, if we do this we will have to install a retaining wall to hold all of the soil. Any suggestions? Do we need to put some type of plastic, fabric etc. between the wall and the soil?
Thanks!
Bookmarks