Dave,
Thanks for that reply. My strategy is to limp along until October when I do a full rebuild of the pool. Then I will start fresh with the BBB method and then it is smooth sailing....
Dave,
Thanks for that reply. My strategy is to limp along until October when I do a full rebuild of the pool. Then I will start fresh with the BBB method and then it is smooth sailing....
Bookmarks