Sorry about the link. I must have copy/pasted the wrong one. Here's the correct one:
http://pg.photos.yahoo.com/ph/veteri...m?.dir=a97bre2
We have some plastic to install on the walls. Our directions say to go 12" up and 12" out onto the floor. They say it is optional but we are doing this.
We also have some 4 mil black plastic that we are gonna put on the ground before the pool gets built, it will go under the sand and extend beyond the pool boundry. Here is our sequence:
After ground is more level (too hot to work outside today) we will
1. Lay out the black plastic even over the blocks. This will go across the entire pool surface. Cutting excess where necessary.
2. Layout the bottom track over plastic.
3. Bring in the sand and pile in the middle to allow room for "wall" plastic to go onto floor.
4. Install the wall.
5. Tape the other plastic onto wall with duck tape and run all the way onto pool floor.
6. Smooth out the sand and build the sand cove. Mist with water and tamp.
7. Liner and water.
8. Thank Jesus we are filling our pool and that we got through it.
9. Swim until the sun comes up.
Looks good on paper huh?
It was so hot here that you can hardly breathe when you go outside. That is just a bit too dangerous for us. It is supposed to be almost this hot tomorrow too but we have to go somewhere so we will work when we get back around 7:00pm. Tilling, scraping and shoveling.
Our goal is H2O by Sunday eve.
Rhon