    I've seen that new plaster releases alot of alkalinity and some calcium.
    The water in my area is very soft. (about 50ppm calcium)
    My questions are:1. Should I allow the plaster to cure 4-6 weeks before
    adding calcium?
    2. Am I causing damage to the plaster by doing so?
    I've seen water come up to 200+ppm by the end of the cureing process.
    3. Is this the right or wrong thing to do?

    Thanks much,
    Rick aka deepnnet

  2. #2
    mas985's Avatar
    mas985 is offline Lifetime Member Whizbang Spinner mas985 3 stars mas985 3 stars mas985 3 stars
    Join Date
    Dec 2004
    Location
    Pleasanton, CA
    Posts
    1,423

    Default Re: new plaster

    I am not clear as to what your current calcium hardness measurement for the pool is. If your calcium is already past 200 ppm then you are OK. Keep your PH down to 6.8-7.2 during this time and the plaster dust should contribute to the calcium.
    Last edited by mas985; 07-20-2006 at 07:51 PM.
    Mark
    Hydraulics 101; Pump Ed 101; Pump/Pool Spreadsheets; Pump Run Time Study; DIY Acid Dosing; DIY Cover Roller
    18'x36' 20k plaster, MaxFlo SP2303VSP, Aqualogic PS8 SWCG, 420 sq-ft Cartridge, Solar, 6 jet spa, 1 HP jet pump, 400k BTU NG Heater

  3. #3
    Join Date
    May 2006
    Location
    Sanford, FL
    Posts
    387

    Default Re: new plaster

    Calcium will leach out of the plaster if the calcium level is below 200ppm - you don't want this to happen as it can damage the plaster. Yes - you want to get it to the 200-400ppm range.
    Completed 8/21/06
    14,000 gallon 3'-6' concrete pool with Diamond Brite
    Spa with spillway
    250K BTU gas heater (for spa)
    SWCG - Aqua Rite
    Hayward Super II Pump - Cartridge filter

    See pictures here http://www.philsimmons.com/family/ga...mages&keyword=

  4. #4
    Join Date
    Jul 2006
    Posts
    3

    Default Re: new plaster

    Thank you for your responce. sorry for taking so long to reply,I've been
    really busy the last couple of days.
    Let me make the question more clear.
    How soon after a new white plaster pool is filled (fill water @ 50ppm)
    should calcium be adjusted? If left unchecked , the calcium will rise on
    it's own during the 4-6 week curing process.(I've seen it go as high as 300)
    Note: I do keep the pH low ~7.0 during this time to battle the rising
    alkalinity.
    Should I add calcium right after fill? will that halt further calcium release
    from the new plaster? Or is the plaster going to release more calium anyway (low pH)
    and possibly end up with very high levels at the end of the curing process
    and possible scaling problems?
    Thank you very much! Rick aka deepnnet
    Last edited by deepnnet; 07-22-2006 at 09:30 PM.

  5. #5
    mas985's Avatar
    mas985 is offline Lifetime Member Whizbang Spinner mas985 3 stars mas985 3 stars mas985 3 stars
    Join Date
    Dec 2004
    Location
    Pleasanton, CA
    Posts
    1,423

    Default Re: new plaster

    If this is not the first fill after new plaster, then I would go ahead and raise the calcium to 200 ppm.

    If it is the first fill after new plaster, then I would drop the PH to 6.8-7.0 and after a 3-4 days, test the water and if the CH is still below 200 ppm and most of the plaster dust is gone, then I would add calcium.

    Plaster dust can add quite a bit of calcium to the water and it is actually good to start a new plaster pool with a low calcium level since this will dissolve much of the plaster dust and save a bit of time vacuuming it out. Dissolving the pool surface due to low calcium levels is a very slow process so I would not worry too much the first week. But after that, if it is still < 200 ppm, then I would go ahead and add calcium.
    Mark
    Hydraulics 101; Pump Ed 101; Pump/Pool Spreadsheets; Pump Run Time Study; DIY Acid Dosing; DIY Cover Roller
    18'x36' 20k plaster, MaxFlo SP2303VSP, Aqualogic PS8 SWCG, 420 sq-ft Cartridge, Solar, 6 jet spa, 1 HP jet pump, 400k BTU NG Heater

  6. #6
    Join Date
    Jul 2006
    Posts
    3

    Default Re: new plaster

    Thanks Mark thats all I needed to know!
    Rick

+ Reply to Thread

Similar Threads

  1. Plaster repair: white blobs in minor cracks. Time to re-plaster or paint?
    By wpicot in forum In-Ground Pool Construction and Repair
    Replies: 0
    Last Post: 05-22-2012, 07:24 PM
  2. New Plaster
    By SingleBarrel in forum In-Ground Pool Construction and Repair
    Replies: 3
    Last Post: 07-01-2011, 02:53 PM
  3. New Plaster
    By Shredhead in forum Testing and Adjusting Pool Water Chemistry
    Replies: 4
    Last Post: 05-06-2011, 03:41 PM
  4. New re-plaster..please help!
    By JJParrish in forum Pool Chemicals & Pool Water Problems
    Replies: 4
    Last Post: 03-15-2007, 09:28 PM
  5. Is this a bad re-plaster job?
    By j1mw3b in forum In-Ground Pool Construction and Repair
    Replies: 3
    Last Post: 05-24-2006, 08:41 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts