Re: Unable to maintain chlorine levels
Before everyone jumps on the "your chlorine level is too low for the cya level you're maintaining", my two cents worth of advice is this:
You have a high chlorine demand SOMEWHERE, and the only way to get rid of this is to satisfy the demand. This means continually adding chlorine to maintain a high residual until you see the residual maintaining. With cya in your pool, you should be able to maintain the residual for 2-3 days before it dropping off.
I'd recommend using just regular bleach to add EVERYDAY until corrected.
Check your filter to make sure you're not harboring algae in there.
Have you needed to add any chemicals for algae? Most sodium bromide based algaecides require that you add an oxidizer (some form of chlorine) to activate it, and to repeat the dosage several days later. This can affect your chlorine tests.
With salt generators, I recommend maintaining 5-7 ppm (you can go higher if you want) with the system turned off, for a week or two, whenever sodium bromide is used in a salt generator pool.
Sean Assam
Commercial Product Sales Manager - AquaCal AutoPilot Inc. Mobile: 954-325-3859
e-mail: sean@teamhorner.com --- www.autopilot.com - www.aquacal.com
Bookmarks