I answered this in the SWCG and Chlorinators Forum., but I am waiting at least a month.
Pat
Pool was replastered last week. How long do I need to wait before adding the salt so I can fire up my SWG and how long should I wait before returning my Hayward cleaner to the pool ? It's the type with the little wings on the side that falp up and down so I don't want to put it in too soon and have it beat up the plaster.
Any advice?
14'x31' kidney 21K gal IG plaster pool; SWCG (Saline Generating System's SGS Breeze); Pentair FNS Plus 48 DE DE filter; Whisperflow 1 HP pump; 8 hours hrs; kit purchased from Ben; utility water; summer: none; winter: none; PF:5.7
I answered this in the SWCG and Chlorinators Forum., but I am waiting at least a month.
Pat
20,000 Gallon IG Diamond Brite pool, 1.5 HP Sta-Rite pump, Hayward Microclear DE3600 filter, Favco solar panels, Poolpilot DIG-220 with SC-48 cell.
+ SWCG OPERATION thread here: http://www.poolforum.com/pf2/showthread.php?t=1226
+ SWCG Running Costs post here: http://www.poolforum.com/pf2/showthread.php?t=316
+ Effective Stabilizer addition post here: http://www.poolforum.com/pf2/showthread.php?p=6645
The pool company I used recommened 10 days, make sure you brush the sides and floor pushing the film to the main drain(s) everyday for 10 days too. This helps with the plaster cure. HTH
Bookmarks