Sounds pretty reasonable to me. But I'm a vinyl liner.
New gunite pools need to cure so expect to add ALOT of muriatic acid to keep pH down.
You want to keep pH in the 7.3-7.8 range.
Calcium in the 200-400ppm range
Total Alkalinity in the 90 to 125 range (gunite limited-vinyl has a higher limit)
CYA/Stabilizer in the 30-50ppm range
Chlorine depends on your CYA range. for CYA=30-50 you want it Chlorine in the 3-6ppm. Higher is OK. Lower is not.
First: get a reading on these 5 things.
You NEED chlorine in ASAP to prevent algae. So shock it up to 15ppm, just to start.
Adjust your pH.
Then raise you T/A to 90-125. If you need to lower it, follow the thread on doing this.
If your CYA is low, you want to raise it--allow 2 -7 days for the stuff to dissolve in.
Then you can let chlorine levels drop to maint levels.
Once your CYA is where you want it, stop using tablets, powdered shock, and powdered chlorine and only use bleach or liquid chlorine to chlorinate and shock your pool.
And remember that for something like 6 weeks pH will rise steadily and you'll have to add Muriatic Acid to lower it.
Bookmarks