Results 1 to 10 of 12

Thread: Deck Edge...

Threaded View

  1. #4
    matt4x4 is offline Lifetime Member Verb Herder matt4x4 2 stars matt4x4 2 stars
    Join Date
    Dec 1969
    Location
    .
    Posts
    819

    Default Re: Deck Edge...

    My thoughts on this are the following: (I hope you can get under the deck or else nothing much will work)
    Where the last deckboard is, screw a 2x2 or 2x4(on end) under the last deck board, flush with the front face/edge.
    Crawl under the deck and from behind, fasten deck board (5/4" x6") flush with the top of the last deck board - essentially you will drive screws through the 2x2 or 2x4 you just finished mounting into the backside of the decking you're putting on as a fascia board - use appropriately sized screws so tehy do not come through the wood.
    The end result should look pretty good and leave you a 1/4" gap which is perfect.
    I have placed a cross sectional diagram below:
    Attached Images

Similar Threads

  1. pool and coping/concrete edge seperation
    By SLpool in forum In-Ground Pool Construction and Repair
    Replies: 3
    Last Post: 08-08-2012, 06:47 PM
  2. Polynesian pool fiberglass walls and top edge needs refinished
    By polynesianpool in forum In-Ground Pool Construction and Repair
    Replies: 1
    Last Post: 05-25-2012, 03:33 PM
  3. Small sink hole under liner edge
    By joseph310 in forum In-Ground Pool Construction and Repair
    Replies: 6
    Last Post: 07-26-2011, 02:43 PM
  4. How far from the edge of the pool to cut open concrete deck?
    By SalemCastles in forum In-Ground Pool Construction and Repair
    Replies: 2
    Last Post: 05-22-2011, 06:59 PM
  5. moss on a carpet covered deck (factory pool deck)
    By JETTA in forum Above-Ground Pool Construction & Repair
    Replies: 3
    Last Post: 09-08-2006, 07:56 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts