We have had a rainy last few days here in south Georgia, but I have managed to add cyanuric acid to the pool so as my latest readings are as follows: CYA 70, pH 7.4, FC 8.2. I have disconnected the IC40 and have added 484 fl. oz. of 8.25% bleach. This should raise my FC to 20.0. I will check all chemicals tomorrow mid-day. Then my plan is to vacuum the pool as required, reconnect my SWCG system and decrease my pump running time to about 8 hours per day (it had been running at 10 hrs per day. It is cooling off in my area to about a high of 75 and lows in the mid 50's. Any comments on the plan would be most welcome.
Bookmarks