Well, I didn't get the pool up... I spent some more time getting more crushed limestone down and building up the outside...
But, I did get the main drains installed...
Pics:
Getting the main drains setup wasn't as bad as I thought it could have been... It still took a good hour and a half including the concrete, but overall it turned out great... They are both parallel, even and level...
Once the pool is up this weekend I will basically get the rest of the plumbing finished.