So, I got the area finished where the pool will go, it is level within +/- 1/8". It was a major pain getting it that close, but it is solid.
Now, I have all day tomorrow before 10pm to get the pool up and start filling it. What chances do I have to accomplish it?
Here is what I am putting up:
Sharkline Morada RTR 27' x 54" pool
Hardline plumbing is already run to the pool location (remote equipment pad like an in-ground has)
I am installing dual main drains (I need to dig a hole for each drain, a trench for the piping, which is no big deal, and once I have them set where I want them to be I will be pouring a bunch of quick-set concrete around them to solidify them in place)
I will be putting in 1.5" poly foam flooring (so I have to cut the panels for the main drain and for the shape and tape them together)
I will also be putting in a foam wall covering as well as foam cove.
I am using bead receivers and a beaded liner.
I won't have lots of assistance until 4pm, so I am pretty much on my own for most of the day. I will have some limited assistance to hold the wall and such at around noon, but I am doing the majority of the "heavy lifting" on this.
I should have 82-85 degree temps and clear weather and sun all day, so I figure getting the liner in at 3-4pm and hoping to start filling by 4-5pm. That way I should have have sun for another two and a half hours while it is filling.
So, is this doable?
They are forecasting thunderstorms tomorrow evening and isolated thunderstorms for most of thursday/friday. The weekend looks good again, and I will have plenty of assistance, so should I just wait???