Well, got 92-95% of the pool area done... some areas were about 6" of crushed limestone fill.
I will say, the pipes for the pool seem like they are set in concrete the stuff has compacted so solid.
Tomorrow morning I will finish off the last little area, pull the forms, fill them in, compact them, then go around and add a little crushed limestone on top of everything (like 1/4 to 3/8 inch total), level it all, then go hrough and hand compact it all and I should be set to put the pool up...
I did notice I totally forgot to run any sort of wiring for a set of pool lights, but I figure I can dig a channel in the crushed limestone and run the cable in there... I will be using low-voltage pool lighting in any case, so I won't have any real depth issues to worry about...
Also bonding the pool all aorund it should go pretty easy considering I will just need to dig a 2" deep channel in the crushed limestone for the bonding wire to sit in since I will have over 2" of pavers sitting above that point as a walkway around the pool...