    Hi,

    I just had a gunite pool installed last fall. I'm a new pool owner and have a lot to learn but I'll add my 2 cents anyway (I'm sure the generous folks around here will correct me if I make a mistake ).

    You were definitely given bad info about the DE. It should have been added right away.

    Definitely add Chlorine right away and get your CYA to the recommended levels. Not sure what part of the country you're from, but most people here keep their CYA between 30 and 50.

    If you have standard white plaster than you should not need to add any PH up for now. When you brush the plaster the PH will automatically rise. Especially in the early going. If anything, you'll need to add more acid soon after you brush the pool a few times.

    Good luck!

    Lenny

  2. #2
    Join Date
    Dec 2004
    Location
    Orlando, Florida, USA.
    Posts
    177

    Default I will keep an eye on PH levels

    Thanks your replying.
    The instructions I downloaded for an acid startup said not to add chlorine for the first three days, then, on day four, once the PH and alkalinity are within acceptable range then add chlorine (not to exceed 3.5ppm).
    I added the PH UP because it is day four and the PH was still below 7.2. Now I am at 7.5 and my Alk is at 90 so I will start to chlorinate.

    When do I add the Stabalizer? What will this do to my other readings?

    Mike in Central FL

  3. #3
    waterbear's Avatar
    waterbear is offline Lifetime Member Sniggle Mechanic waterbear 4 stars waterbear 4 stars waterbear 4 stars waterbear 4 stars
    Join Date
    Nov 2004
    Location
    St. Augustine, Fl
    Age
    71
    Posts
    3,743

    Exclamation

    I assume you are talking about the acid startup procedure devleoped by United Chemical. If you are following that procedure it is necessary to follow it by the letter! I gather it is a bit controviersial but if done properly gives good results. Be aware that it is different from a normal startup procedure and the two shouldn't be intermixed by my understanding of them. Here is a brief synopsis of the procedure:
    Fill the pool as quickly as possible Do not turn on circulation or pumps
    Add a chelating agent that will work in extremely low pH.
    Add 4 ga muriatic acid per 10.,00 gal water by walking it around the pool and then brush throughly to distribute it.
    Do not add chlorine or vacumn until the plaster dust has disappeared but do brush daily. this will take a few days.
    Neutralize the acid with Soda Ash (ph increaser, washing soda from the grocery store, sodium carbonate---all different names for the same thing)
    This is one place a Base Demand test (as found in the Taylor K-2005 and K-2006 kits is just about necessary since the pool is so acidic and you need to raise the pH quickly). Wait 24 hours, retest, and repeat this step until ph is 7.2 or more.
    When the pH is 7.2 or above turn on your circulation, clean the filter when pressure increases about 10 psi over normal.
    Add your bleach in small amounts until residual is at correct level and then continue with such things as CYA, Calcium , Total Alkalinity. In theroy, the calcium and total alkalinity will be in the correct ballpark when you are finished. Good luck!
    Last edited by waterbear; 04-01-2006 at 12:09 PM.

  4. #4
    Join Date
    Dec 2004
    Location
    Orlando, Florida, USA.
    Posts
    177

    Default Perhaps I am not doing an Acid Startup

    My instructions from the Plasterer was to run the pump immediately after filling. Although I don't have a lot of confidence in him since he told me not to add DE poweder right away -which is wrong.

    I thought I was doing an Acid startup because the Plasterer added 4 gallons of acid to the pool. My instructions were to brush twice a day and after four or five days to balance the water and start swimming.

    The instructions I found on the web are from "Everbrite Pool Finish". They seem to match the instrcutions/procedure I was given regarding the low PH for a couple of days and the running of the pump from day one.

    I am now in day five and beginning to balance the water chemistry. I plan to add Chlorine on Sunday and hopefully be swimming in a few days after that.

    Does it sound like I am doing the right things?

  5. #5
    waterbear's Avatar
    waterbear is offline Lifetime Member Sniggle Mechanic waterbear 4 stars waterbear 4 stars waterbear 4 stars waterbear 4 stars
    Join Date
    Nov 2004
    Location
    St. Augustine, Fl
    Age
    71
    Posts
    3,743

    Default

    If that is the type of finish you have you probably are. The acid startup procedure is for plaster. I don't know what type of finsih everbrite is.

  6. #6
    Join Date
    Dec 2004
    Location
    Orlando, Florida, USA.
    Posts
    177

    Default Finish is called Millenium not Everbrite

    Quote Originally Posted by waterbear
    If that is the type of finish you have you probably are. The acid startup procedure is for plaster. I don't know what type of finsih everbrite is.
    The finish I had installed is from www.Premixmarbeltite.com, it is called Millenium (similar to Diamond Brite. It is a plaster typr finish). The reference to Evebrite was because that was the website were I downloaded the startup instructions. Premixmarbletite did not have startup instructions on their product.
    Mike

+ Reply to Thread

Similar Threads

  1. Intex Super Simple Startup and Maint plan questions
    By vinny600 in forum Pool Chemistry for Intex-type Pools
    Replies: 5
    Last Post: 07-04-2013, 02:09 PM
  2. Gunite already calcium deposits and small hairline cracks of both plaster and gunite
    By getittogether in forum In-Ground Pool Construction and Repair
    Replies: 4
    Last Post: 04-10-2011, 12:45 PM
  3. New Pool Startup
    By stuckpipe in forum Pool Startup, Shutdown, & Winter Operation
    Replies: 2
    Last Post: 03-06-2011, 08:23 PM
  4. We just remodeled our pool-Startup questions...???
    By human in forum Testing and Adjusting Pool Water Chemistry
    Replies: 1
    Last Post: 06-24-2006, 02:52 PM
  5. Restored Gunite yesterday - checmical questions...
    By dcastine in forum In-Ground Pool Construction and Repair
    Replies: 5
    Last Post: 05-10-2006, 06:36 PM

Bookmarks

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts